Commercial Stair Replacement

 

Commercial Stair Replacement

Zodiac Apartments in Albuquerque received all new stair systems from Pascetti Steel. Complete removal of disintegrating steel and concrete units was required.  New concrete footings, ADA complaint galvanized treads, and commercial railing systems are standard with these new stairs.  Coordinated installation of each unit was completed same day, tenants were not affected or inconvenienced during the process.  Owners relied upon this quick turnaround to ensure 100% occupancy and no need to supply emergency housing.

Thank you Zodiac Apartments!

View some of our tread options HERE
  • Ready-to-assemble stair systems for commercial and residential applications
  • Completed stair units with attached railings can be shipped directly to the job site
  • Custom  treads available to meet any application
  • Finishes include chemical treatments, paint, and a wide range of powder-coating colors.
  • Detailed, professional shop drawings to ensure accuracy
  • We can ship pre-finished railing to any location, complete with all hardware and installation recommendations.
  • We’ll work from your drawings or we can create a design for you.

Commercial stair replacement 

 CHECK OUT THESE BEFORE AND AFTER PICTURES ———> 

Stay up to date on all our projects on Facebook!
BEFORE
AFTER

Commercial stair replacement 

Commercial stair replacement. Finishes include chemical treatments, paint, and a wide range of powder-coating colors. Detailed, professional shop drawings to ensure accuracy. We can ship pre-finished railing to any location, complete with all hardware and installation recommendations. We’ll work from your drawings or we can create a design for you.

Zodiac Apartments in Albuquerque received all new stair systems from Pascetti Steel. Complete removal of disintegrating steel and concrete units was required.  New concrete footings, ADA complaint galvanized treads and commercial railing systems are standard with these new stairs.  Coordinated installation of each unit was completed the same day, tenants were not affected or inconvenienced during the process.  Owners relied upon this quick turnaround to ensure 100% occupancy and no need to supply emergency housing.  Thank you Zodiac Apartments! Commercial Stair Replacement